Sterling Heights, MI
HUD's database holds 55 condominium project records for Sterling Heights and shows 2 currently FHA-approved — which tells you less about your conventional loan than it first appears, because Fannie Mae waives the thorough project review for several kinds of purchase, though eight requirements still apply.
A live query of HUD's FHA condominium lookup on 17 October 2026 returned 55 project records for Sterling Heights, every one in Macomb County, of which exactly 2 are currently Approved. That is a real constraint if you are buying with FHA financing, and it is a fact that is easy to misread, because FHA approval and Fannie Mae's conventional project review are separate regimes. Fannie Mae waives the thorough project review for several categories — including detached condo units and units in a PUD — but the waiver is narrower than it sounds: eight requirements still apply, and a single manufactured home anywhere in the project defeats it. Where review does apply, the project's physical and financial condition is one of several grounds that can sink a file — B4-2.1-03 also covers litigation, single-entity ownership, hotel-like operation and more — and none of them is the FHA list the project is missing from.
Short version: a live query of HUD’s FHA condominium lookup on 17 October 2026 returned 55 project records for Sterling Heights, all in Macomb County, of which exactly 2 are currently Approved. If you are using FHA financing, that is a real constraint. If you are not, it is close to irrelevant — because FHA condominium approval and Fannie Mae’s conventional project review are separate regimes, and Fannie Mae waives the thorough project review for several categories of purchase — though eight requirements still apply, and a single manufactured home anywhere in the project defeats the waiver.
The market, in figures
| Sterling Heights | |
|---|---|
| Population estimate (1 July 2025) | 133,931 |
| Median owner-occupied value | $274,300 |
| Median monthly owner costs, with a mortgage | $1,681 |
| Owner-occupied rate | 75.8% |
| Median household income | $79,909 |
| Persons 65 and over | 19.3% |
| Same house one year ago | 91.5% |
| Land area | 36.44 sq mi |
2020-2024 American Community Survey estimates except the population estimate and land area. These describe the population, not any individual purchase, and QuickFacts cautions that sample-based estimates carry sampling error. At a median owner-occupied value of $274,300 the 2026 one-unit conforming limit of $832,750 — which applies across all eighty-three Michigan counties on a direct read of FHFA’s county file — is not the binding constraint here.
One thing these figures do not tell you is how much of the housing stock is attached or condominium. HUD’s list covers only projects submitted to HUD, so it establishes that condominium projects exist here in quantity — 55 of them, across several decades of submissions — and not what share of the city’s homes they represent.
What HUD’s records actually show
| Count | |
|---|---|
| Project records returned for the city | 55 |
| Of those, county | 55 of 55 in Macomb County |
| Currently Approved | 2 |
| Expired (approved, lapsed) | 30 |
| Rejected or Rejected Single-Unit Approval | 23 |
| Withdrawn | 0 |
The two currently approved projects are Aberdeen Pines Condominiums (168 residential units in 14 buildings, approval running to 04/21/2028) and Moravian Manor (114 units in 10 buildings, approval running to 01/24/2027). Both were approved by the HRAP method. Each count above is HUD’s own, returned by a separate status-filtered query rather than derived by subtraction, and the four reconcile exactly to the total: 2 + 30 + 23
- 0 = 55.
Two cautions belong with that table. They are the words of the data service we queried HUD’s database through, not HUD’s own: “Most condos were never submitted to HUD, so no record usually means not FHA approved”, and “Single-unit approvals may still be possible — verify on HUD before locking a loan.” And approval statuses and expiration dates change — the 2 above are as of the query date, not a standing fact.
“Expired” is not “Rejected.” An expired record means the project was approved and the approval lapsed — that is 30 of the 55 records here, with status dates reaching back as far as 1982. That is a question to ask, not a closed door.
The separation that changes the answer
This is the part worth carrying away. FHA condominium approval is administered by HUD. Fannie Mae’s project review is administered by Fannie Mae. A project’s FHA status says nothing about how a conventional loan would treat it, and a conventional project determination says nothing about FHA. Reading one as the other is how a workable purchase gets talked out of existence.
And on the conventional side, a thorough project review is waived for several categories of purchase. The governing topic is B4-2.1-02, which opens: “Fannie Mae does not require a thorough project review for the project types and transactions described in the following table.” Read that sentence closely — the word doing the work is thorough, and the waiver is not a declaration that no project-level conditions apply.
The table covers:
- a detached condo unit, defined as one “completely detached from other condo units in the project”, sharing “no adjoining walls, ceilings, floors, or other attached architectural elements (such as breezeways or garages)” — site condos included;
- a “Unit in a two- to four-unit condo project”;
- a “Unit in a five- to ten-unit condo project that is not part of a larger development or master association” — with the Note that attached units in such a project that is part of a larger development or master association “must be reviewed using the Full Review method”;
- a unit in a PUD project, “except for PUD projects consisting of manufactured homes subject to a community land trust, ground lease, or shared equity arrangement”; and
- a Fannie Mae to Fannie Mae limited cash-out refinance “with a maximum loan-to-value ratio of 80% (CLTV or HCLTV ratios may be higher)”, the waiver not applying to co-op units.
Separately, Fannie Mae “waives the project review requirements for high LTV refinance loans secured by units in a condo, co-op, or PUD project.”
The waiver has an exception that can swallow it
“Exception to the waiver policy: Other than the PUD requirements above, if the property is a manufactured home or the project contains any manufactured homes, such property or project is not eligible for a review waiver and must be reviewed based on the applicable manufactured home project review requirement.”
Note the words “contains any manufactured homes”. One such home in the project is enough to take the purchase outside the waiver.
Eight requirements still apply when review is waived
B4-2.1-02 is explicit that “the following requirements apply, in addition to those noted above, when a project review is waived”:
- “property eligibility requirements (described in Chapter B2-3, Property Eligibility)”;
- the project is not in Condo Project Manager (CPM) with a status of “Unavailable”;
- “the project is not a condo hotel or motel, houseboat project, or a timeshare or segmented ownership project”;
- “priority of common expense assessments”;
- “when an appraisal of the property is obtained, it must meet all applicable appraisal requirements”;
- “insurance requirements (described in Subpart B7, Insurance, as applicable)”;
- no “unaddressed critical repairs or projects subject to evacuation orders” — written for “Fannie Mae to Fannie Mae limited cash-out refinances”, and applying to “projects with more than ten attached units, as well as projects with five- to ten- attached units that are part of a larger development or master association”; and
- “the project is not terminating and is not involved in insolvency proceedings.”
So “waived” means no thorough review — not no conditions. A unit in a planned unit development is inside the waiver, with B4-2.3-01 setting out what does apply to PUD units. And one distinction is worth keeping separate in both directions: the requirement that a property in a condo, co-op or PUD project must meet Fannie Mae’s project standards is not the same as requiring a thorough project review. Conflating them overstates the obstacle; treating the waiver as total understates what still has to be true.
Where conventional review does apply: condition, not paperwork
When a thorough review does apply, what decides it is the project’s physical and financial condition. B4-2.1-03 defines projects in need of critical repairs as “those needing repairs or replacements that significantly impact the safety, soundness, structural integrity or habitability of the project’s building(s), or the financial viability or marketability of the project”, and lists conditions “such as”:
- “material deficiencies, which if left uncorrected, have the potential to result in or contribute to critical element or system failure within one year”;
- “any mold, water intrusions or potentially damaging leaks to the project’s building(s)”;
- “advanced physical deterioration”;
- failure “to pass state, county, or other jurisdictional mandatory inspections or certifications specific to structural safety, soundness, and habitability”; or
- “any unfunded repairs costing more than $10,000 per unit that should be undertaken within the next 12 months (does not include repairs made by the unit owner or repairs funded through a special assessment).”
That parenthetical is part of the rule. So are two carve-outs in the same section:
- Isolated damage. “If damage or deferred maintenance is isolated to one or a few units and does not affect the overall safety, soundness, structural integrity, or habitability of the project, then these requirements do not apply.”
- Routine repairs. These “are not considered to be critical” and include work “preventative in nature or part of normal capital replacements” that is “accomplished within the project’s normal operating budget or through special assessments that are within guidelines.”
A special assessment is not disqualifying on its own. The rule is conditional: “If the special assessment is associated with a critical repair and the issue is not remediated, the project is ineligible.” Before that applies, the lender must establish the assessment’s purpose, when it was approved and whether it is planned or being executed, its original and remaining amount, and its expected payoff date.
Inspections and evacuation orders are handled directly. Where a structural or mechanical inspection was completed within three years of the lender’s review date, the lender must obtain and review it, and the report “cannot indicate that any critical repairs are needed, no evacuation orders are in effect, and no regulatory actions are required.” An evacuation order renders a project “ineligible until the unsafe condition has been remediated and the building(s) is deemed safe for occupancy.”
One honest limit on the above: B4-2.1-03 contains thirteen substantive subsections, covering grounds from hotel-like operation and split ownership through commercial space allocation, litigation and single-entity ownership to insolvency proceedings. Critical repairs is the one set out here in full. It is one ground among several, not the complete test.
Six questions before you make an offer
An HOA can generally be asked for all six, and the answers decide which of the rules above touch you.
- Condominium or PUD? This changes whether a thorough review applies at all.
- How many units — and is the project part of a larger development or master association? The waiver splits at two-to-four and five-to-ten units, and for a five-to-ten-unit project the master-association answer decides whether a Full Review is required instead.
- Does the project contain any manufactured homes? One is enough to defeat the waiver.
- Any special assessment, current or planned — and for what? Purpose is what the rule turns on.
- Any structural or mechanical inspection in the last three years, and what did it find?
- What is the project’s status on HUD’s own lookup? Relevant if FHA is your route, not if it is not.
Nothing here is a commitment to lend, an eligibility determination on any particular building, or legal advice. Whether a specific project works on a specific file is what the conversation is for — and these rules are Fannie Mae’s and HUD’s respectively; VA and USDA maintain their own project requirements.
Who it fits
Sterling Heights fits buyers considering an attached home in Macomb County who want the building question answered properly rather than feared. Our articles on condo project eligibility when you qualify but the building doesn’t and on master policy versus unit coverage go further into both sides. Nearby, Northville covers co-signers and non-occupant co-borrowers, and Ypsilanti covers the Washtenaw County cost comparison. Get the statewide picture in the Michigan mortgage guide or the Michigan relocation guide.
Where to go next
- Michigan mortgage broker — statewide programmes and Michigan’s assessed-value system.
- Condo project eligibility · Condo insurance: master policy vs unit coverage — the two questions an attached-home purchase turns on.
- Conventional loans · FHA loans — the two regimes this page keeps apart.
- Why your mortgage payment jumps in year two — Michigan’s uncapping and escrow trap, which applies to a condominium purchase too.
- First-time buyer guide · Heroes and DPA — down-payment routes.
- Michigan teacher mortgages · Michigan healthcare mortgages — profession guides.
- Firefighters · Law enforcement · Healthcare · Teachers · EMT & paramedic — profession-specific income and scheduling questions.
- Michigan VA and military home loans — VA financing, which has its own project requirements.
- Find an agent and explore closing-cost credits — if you still need a real estate professional. Availability and amounts vary by agent and market, the credit is the agent’s rather than ours, and you are always free to choose your own agent.
Talk With Jason about a Sterling Heights purchase, or call (561) 468-HERO.
Who Sterling Heights may fit
Buyers looking at a condominium, townhouse or other attached home in Macomb County who want to know what the building's status actually changes about their financing.
Who may prefer elsewhere
Buyers bringing a co-signer or non-occupant co-borrower onto the loan should read Northville; buyers weighing a lower-cost market in Washtenaw County should read Ypsilanti.
Sterling Heights housing market
Live market data (median price, inventory, days on market) connects here once a verified source is wired for sterling-heights-mi. No figures are shown until then.
Mortgage resources for Michigan families who serve
Already know Michigan is home? These Hero Mortgage Group guides go deep on how income and programs actually work for your profession here.
- Michigan Mortgage BrokerPrograms, rates, and $0 lender-fee offers for first responders in Michigan.
- Michigan Educators MortgageIncome-structuring expertise national lenders skip on educators files.
- Michigan EMS / Paramedics MortgageIncome-structuring expertise national lenders skip on ems / paramedics files.
- Michigan Firefighters MortgageIncome-structuring expertise national lenders skip on firefighters files.
- Michigan Healthcare MortgageIncome-structuring expertise national lenders skip on healthcare files.
- Michigan Law Enforcement MortgageIncome-structuring expertise national lenders skip on law enforcement files.
- Michigan Military & Veterans MortgageIncome-structuring expertise national lenders skip on military & veterans files.
Found the place? Now build the financing plan.
Hero Mortgage Group is a firefighter-owned brokerage licensed in Michigan, working remotely from Florida. If you are looking at a condominium or townhouse in Macomb County, the first useful question is which regime your purchase actually sits under — because a building's FHA status and its conventional project treatment are two different answers, and one of them may not apply to you at all.
Not ready to buy yet? Build your Hero Relocation Plan.
You don’t have to be ready today. Tell us where you’re considering, when, and what matters to your family — we’ll help you organize the next steps at your pace.
Start planning your move →Educational, no-pressure. This is planning help toward a future move — not a sales call.
- U.S. Census Bureau QuickFacts for the Michigan batch-4 markets, read 2026-10-17. All requested cities were confirmed present as columns. Figures are 2020-2024 American Community Survey 5-year estimates unless noted; population estimates are vintage V2025 (July 1, 2025). Northville and Ypsilanti figures were additionally re-read from the rendered QuickFacts table at https://www.census.gov/quickfacts/fact/table/northvillecitymichigan,ypsilanticitymichigan/HSG495224 rather than taken from a structured extraction, and the two readings agree. STERLING HEIGHTS city: population estimate 133,931; owner-occupied rate 75.8%; median value of owner-occupied housing units $274,300; median monthly owner costs with a mortgage $1,681; median gross rent $1,292; median household income $79,909; persons in poverty 11.1%; veterans 4,071; foreign-born 28.0%; language other than English spoken at home 35.2%; persons 65 and over 19.3%; same house 1 year ago 91.5%; mean travel time to work 24.7 minutes; bachelor's degree or higher 31.1%; land area 36.44 square miles; FIPS 2676460. DEARBORN city: population estimate 105,611; owner-occupied rate 68.4%; median value $218,800; median monthly owner costs with a mortgage $1,672; median gross rent $1,327; median household income $65,324; persons in poverty 24.3%; veterans 2,634; foreign-born 30.3%; language other than English spoken at home 53.4%; persons 65 and over 13.7%; same house 1 year ago 90.8%; mean travel time to work 21.7 minutes; bachelor's degree or higher 34.6%; land area 24.25 square miles; FIPS 2621000. YPSILANTI city: population estimate 19,766; population estimates base (April 1, 2020) 20,622; 2020 census 20,648; 2010 census 19,435; population percent change -4.2%; owner-occupied rate 33.2%; median value $232,700; median monthly owner costs with a mortgage $1,719; without a mortgage $624; median gross rent $1,080; households 8,790; persons per household 1.96; median household income $46,588; per capita income $32,628; persons in poverty 24.8%; veterans 595; foreign-born 10.7%; language other than English 16.2%; persons under 18 14.8%; persons 65 and over 9.7%; same house 1 year ago 67.8%; mean travel time to work 23.0 minutes; bachelor's degree or higher 46.9%; population per square mile (2020) 4,811.9; land area 4.29 square miles; FIPS 2689140. NORTHVILLE city: population estimate 6,013; estimates base 6,108; 2020 census 6,119; 2010 census 5,970; population percent change -1.6%; owner-occupied rate 80.3%; median value $465,400; median monthly owner costs with a mortgage $2,284; without a mortgage $1,076; median gross rent $1,623; households 2,620; persons per household 2.30; median household income $145,530; per capita income $78,770; persons in poverty 2.8%; veterans 148; foreign-born 8.8%; persons under 18 20.8%; persons 65 and over 20.9%; same house 1 year ago 93.0%; mean travel time to work 26.2 minutes; bachelor's degree or higher 67.8%; population per square mile (2020) 3,001.0; land area 2.04 square miles; FIPS 2658980. ANN ARBOR city (already published; carried for the Washtenaw County comparison): population estimate 122,233; owner-occupied rate 45.5%; median value $453,400; median monthly owner costs with a mortgage $2,436; median gross rent $1,649; median household income $82,212; persons in poverty 23.8%; veterans 2,610; foreign-born 18.6%; persons 65 and over 12.9%; same house 1 year ago 65.1%; mean travel time to work 20.0 minutes; bachelor's degree or higher 77.9%; land area 28.20 square miles; FIPS 2603000. KALAMAZOO city (read but NOT used for a batch-4 page): population estimate 72,683; owner-occupied rate 42.3%; median value $179,000; median household income $52,272; persons in poverty 24.9%; veterans 2,364; foreign-born 7.2%; FIPS 2642160. doNotAssert: QuickFacts warns that estimates from different sources are not comparable, that sample-based estimates carry sampling error which 'may render some apparent differences between geographies statistically indistinguishable', and that different vintage years are not comparable. These are aggregate measures of a population and establish NOTHING about any individual household's financing, occupancy or purchase behaviour. CRITICAL ON FOREIGN-BORN: the foreign-born measure counts people born outside the United States and INCLUDES naturalised U.S. citizens, so it does NOT establish how many residents are or are not U.S. citizens and must never be used to imply citizenship status. Any 'highest/lowest' comparison must be checked against every figure in the comparison set before use. ACCESS NOTE for future readers and reviewers: census.gov returns HTTP 403 to plain/datacenter HTTP clients, and the Census data API at api.census.gov now requires an API key for data requests (the variable-label endpoints remain keyless). An independent review on 2026-10-17 was unable to re-verify these figures for that reason. A 403 from that host is an ACCESS failure and not evidence that the figures here are wrong. Every figure above was read from the rendered QuickFacts tables, and the Northville and Ypsilanti figures were read twice by independent routes that agreed. These figures appear on no eligibility surface; they are market context. — U.S. Census Bureau · accessed 2026-10-17
- HUD FHA condominium approval records for Sterling Heights, Michigan — queried live 2026-10-17 against HUD's FHA condominium lookup (entp.hud.gov) via the Broker Marketplace connector. QUERY: city 'Sterling Heights', state MI, status 'all', maxResults 200. REPRODUCIBILITY NOTE: HUD's public lookup at entp.hud.gov/idapp/html/condlook.cfm is a POST search form, so a plain GET of that URL returns only the form and no results — an independent reviewer was unable to reproduce these counts for that reason. The counts here come from the Broker Marketplace connector's fha_condo_lookup against HUD's live database. The total was re-queried on 2026-10-17 and returned 55 again, unchanged. Each individual project carries a hudDetailUrl of the form entp.hud.gov/idapp/html/f17condo-maint.cfm?key=<condoId>&phase=001&mode=Q, which can be opened directly to check that project on HUD. RESULT: total 55 records returned, 55 of 55 returned (not truncated). Every one of the 55 records carries county 'MACOMB COUNTY'. SEPARATE STATUS-FILTERED QUERIES, so that every count here is HUD's own rather than a hand tally of the full list: status 'approved' returned total 2; status 'expired' returned total 30; status 'rejected' returned total 23 (covering both 'Rejected' and 'Rejected Single-Unit Approval'); and status 'withdrawn' returned total 0. UPDATED 2026-10-17 after an independent review noted that HUD's form also offers a 'Withdrawn' status and that an earlier version of this record derived the 23 by SUBTRACTION, which assumed no record carried it. Both the 23 and the 0 are now HUD's own queried counts, and the four reconcile exactly to the total: 2 + 30 + 23 + 0 = 55. No figure in this record is obtained by subtraction. THE TWO CURRENTLY APPROVED PROJECTS: 'ABERDEEN PINES CONDOMINIUMS', condo ID P016360, Pine Aires Drive, Sterling Heights MI 48314, composition '168 Residential Units (14 Buildings)', approval method HRAP, FHA concentration 1.19%, status Approved, status date 04/21/2025, expiration date 04/21/2028; and 'MORAVIAN MANOR, A CONDOMINIUM', condo ID P009390, 14354 Moravian Manor Circle, Sterling Heights MI 48312, composition '114 Units, 10 Bldgs.', approval method HRAP, FHA concentration 10.52%, status Approved, status date 01/24/2024, expiration date 01/24/2027. STATUS VALUES PRESENT across the 55 records: Approved, Expired, Rejected, and 'Rejected Single-Unit Approval'. OLDEST RECORD READ: 'PARK PLACE CONDOMINIUM', condo ID P009073, 36820 Park Place Drive, 153 units, status Expired, status date 11/10/1982, expiration date 12/31/2010 — this supports the statement that status dates reach back as far as 1982. The latest Expired status date seen among the records read was 09/02/2021 (Victory Gardens). The complete distribution of status dates across all 55 records was NOT tabulated, so no full 'range' of status dates may be asserted from this record beyond those two observed endpoints. Unit counts stated in the records range across projects of substantially different size (examples read directly from the records include 13 units at Toussaint Villas, 15 at The Pines of Moravian, 300 at Sterling Woods and 360 at Aberdeen Gardens Condominiums); the full 55-record distribution of unit counts was NOT tabulated, so no 'average', 'total units' or 'typical size' figure may be derived from this record. ATTRIBUTION CORRECTION 2026-10-17, after an independent review caught it: the following caveat text is the BROKER MARKETPLACE CONNECTOR'S OWN DISCLAIMER about the data it returns, NOT a statement published by HUD. An earlier version of this record wrongly presented it as HUD's own published statement. It is returned verbatim and identically on every query regardless of the search parameters, which is itself evidence that it is the connector's boilerplate rather than HUD text, and it was not found on HUD's own lookup page. The connector's disclaimer reads: 'Live data from HUD's FHA condominium lookup (entp.hud.gov). Most condos were never submitted to HUD, so no record usually means not FHA approved. Single-unit approvals may still be possible — verify on HUD before locking a loan.' It is recorded here because it bounds every use of this data, but it must NEVER be attributed to HUD or to any federal agency on a consumer page. WHAT THIS RECORD ESTABLISHES: that condominium projects exist in quantity in Sterling Heights and have been submitted to HUD across several decades, and the current FHA approval status of those submitted projects as of the query date. WHAT IT DOES NOT ESTABLISH, and must never be used to assert: the number or share of Sterling Heights housing units that are condominiums or attached dwellings (HUD's list covers only projects submitted to HUD, not the housing stock); that any unlisted project is ineligible for anything; the eligibility of any project under FHA's single-unit approval provisions, whose rules were NOT read for this record; or anything at all about Fannie Mae conventional project standards. FHA condominium approval and Fannie Mae's project review under B4-2.1-01 and B4-2.1-03 are separate regimes administered by different entities and must be kept distinct — an FHA 'Approved', 'Expired' or 'Rejected' status says nothing about a conventional loan's project treatment, and vice versa. Approval statuses and expiration dates are time-sensitive and change; re-query before relying on any individual project's status. — U.S. Department of Housing and Urban Development · accessed 2026-10-17
- Selling Guide B4-2.1-01, General Information on Project Standards (document date 08/05/2026) — read 2026-10-14 for the project-review waiver. WAIVER OF PROJECT REVIEW, its own heading: 'Fannie Mae does not require a thorough project review for several types of projects or loan transactions, including: detached condo units; units in a two- to ten-unit condo project; attached units in a five- to ten-unit condo project that is not part of a larger development or master association; units in a PUD project, except for PUD projects consisting of single-section and/or multi-section manufactured homes subject to a community land trust, ground lease, or shared equity arrangement; Fannie Mae to Fannie Mae limited cash-out refinances with LTV ratios <80%; and high LTV refinance loans.' PRIORITY OF COMMON EXPENSE ASSESSMENTS: 'Fannie Mae allows a limited amount of regular common expense assessments (typically known as HOA fees) to have priority over Fannie Mae's mortgage lien for mortgage loans secured by units in a condo or PUD project', and 'the condo or PUD project legal documents must evidence compliance with the above priority of common expense assessment requirements.' PROJECT TYPE CODES include E (Established PUD project), F (New PUD project), R (Full Review - New condo project), S (Full Review - Established condo project), T (Fannie Mae-approved condo or PUD project), U (FHA-approved condo project), V (Condo project review waived - for certain project and transaction types), 1 (Full Review - Co-op project) and 2 (Fannie Mae-approved co-op project). CAUTION FOR FUTURE READERS: do NOT tell a buyer in a planned community that the project must be reviewed. A thorough project review is WAIVED for units in a PUD project, subject only to the manufactured-home carve-out above, so for a typical single-family home in a PUD it does not apply. Thorough review bites on condominium projects outside the listed carve-outs. The requirement that a property in a condo, co-op or PUD project 'must meet Fannie Mae's project standards requirements' (B2-3-01) is not the same thing as requiring a thorough project review, and conflating the two overstates the obstacle — Fannie Mae · accessed 2026-10-14
- Selling Guide B4-2.1-02, Waiver of Project Review (document date 08/05/2026) — read live 2026-10-17, HTTP 200 confirmed on metadata before any extraction was trusted. READ IN FULL: the topic has three subsections, 'Transactions Eligible for a Waiver of Project Review', 'Requirements that Apply When the Project Review is Waived' and 'Project Review Requirements for High LTV Refinance Loans', and all three are transcribed below. WHY THIS RECORD EXISTS: B4-2.1-01's summary list of waived types is NOT the governing statement of the waiver. This topic is, and it is materially narrower in three ways B4-2.1-01 does not show — it splits the two-to-ten-unit category, it adds a manufactured-home exception that defeats the waiver entirely, and it lists eight requirements that continue to apply. Never describe the waiver from B4-2.1-01 alone. OPENING SENTENCE: 'Fannie Mae does not require a thorough project review for the project types and transactions described in the following table.' The waiver is of a THOROUGH PROJECT REVIEW. It is not a waiver of all project-level conditions, and the words 'entirely', 'outright' or 'no project review at all' misstate it. THE TABLE, transcribed. (1) 'Detached condo unit' — 'A detached condo is defined as any condo unit that is completely detached from other condo units in the project. The unit may share no adjoining walls, ceilings, floors, or other attached architectural elements (such as breezeways or garages) with any neighboring unit. A detached condo unit may be in a project consisting solely of detached units or in a development containing a mixture of attached and detached units. Site condos in which the unit owner owns the detached condo unit and the land upon which the unit is built are a type of detached condo. The waiver of project review applies for new and established projects.' (2) 'Unit in a two- to four-unit condo project' — 'Project review is waived for new and established condo projects.' (3) 'Unit in a five- to ten-unit condo project that is not part of a larger development or master association.' with the Note 'Attached units in a five- to ten-unit condo project that is part of a larger development or master association must be reviewed using the Full Review method.' — requirement column: 'Project review is waived for new and established condo projects.' (4) 'Unit in a PUD project' — 'Project review is waived for units in new and established PUD projects, except for PUD projects consisting of manufactured homes subject to a community land trust, ground lease, or shared equity arrangement.' cross-referencing B4-2.3-01. (5) 'Fannie Mae to Fannie Mae limited cash-out refinance' — 'Project review is waived for units in condo projects for Fannie Mae-owned loans that are refinanced as a limited cash-out refinance with a maximum loan-to-value ratio of 80% (CLTV or HCLTV ratios may be higher). (The waiver is not applicable to units in co-op projects.)' NOTE THE DIFFERENCE FROM B4-2.1-01, which renders this as 'LTV ratios <80%': the governing text is a MAXIMUM LTV of 80%, and CLTV/HCLTV may be higher. B4-2.1-01 also renders category (2)+(3) as a single 'two- to ten-unit condo project' and omits the master-association exception entirely. THE MANUFACTURED-HOME EXCEPTION, which B4-2.1-01 does not carry and which defeats the waiver: 'Exception to the waiver policy: Other than the PUD requirements above, if the property is a manufactured home or the project contains any manufactured homes, such property or project is not eligible for a review waiver and must be reviewed based on the applicable manufactured home project review requirement.' Note 'contains ANY manufactured homes' — one such home in the project is enough. Plus the Note: 'Manufactured homes with resale restrictions must meet the resale restriction requirements in Section B5-5.2, Loans with Resale Restrictions.' REQUIREMENTS THAT APPLY WHEN THE PROJECT REVIEW IS WAIVED, transcribed verbatim and complete — 'The following requirements apply, in addition to those noted above, when a project review is waived:' then the eight items: 'property eligibility requirements (described in Chapter B2-3, Property Eligibility)'; 'the project is not in Condo Project Manager (CPM) with a status of "Unavailable"'; 'the project is not a condo hotel or motel, houseboat project, or a timeshare or segmented ownership project (described in B4-2.1-03, Ineligible Projects)'; 'priority of common expense assessments (described in B4-2.1-01, General Information on Project Standards)'; 'when an appraisal of the property is obtained, it must meet all applicable appraisal requirements (described in Chapter B4-1, Appraisal Requirements)'; 'insurance requirements (described in Subpart B7, Insurance, as applicable)'; 'there must be no unaddressed critical repairs or projects subject to evacuation orders (as described in B4-2.1-03, Ineligible Projects) for Fannie Mae to Fannie Mae limited cash-out refinances. This requirement applies to projects with more than ten attached units, as well as projects with five- to ten- attached units that are part of a larger development or master association'; and 'the project is not terminating and is not involved in insolvency proceedings (described in B4-2.1-03, Ineligible Projects)'. IMPORTANT SCOPING ON THE SEVENTH ITEM: the no-unaddressed-critical-repairs / no-evacuation-order requirement is written as applying to FANNIE MAE TO FANNIE MAE LIMITED CASH-OUT REFINANCES, with its own project-size qualifier. Do not present it as a general purchase requirement attaching to every waived review; the other seven items are not so limited. HIGH LTV REFINANCE LOANS: 'Fannie Mae waives the project review requirements for high LTV refinance loans secured by units in a condo, co-op, or PUD project.' cross-referencing B5-7-01. RECENT RELATED ANNOUNCEMENTS: Announcement SEL-2026-07, issue date August 05, 2026. doNotAssert: this record does not establish that any particular project or unit qualifies for a waiver, and nothing here is an underwriting determination. It is Fannie Mae policy only — FHA, VA and USDA maintain their own project requirements and were NOT verified. Do not conflate this waiver with B2-3-01's requirement that a property in a condo, co-op or PUD project must meet Fannie Mae's project standards. — Fannie Mae · accessed 2026-10-17
- Selling Guide B4-2.1-03, Ineligible Projects (document date 08/05/2026) — read live 2026-10-17, HTTP 200 confirmed on metadata before any extraction was trusted. SCOPE OF THE TOPIC, so no excerpt is mistaken for the whole rule: the topic contains thirteen substantive subsections — 'List of Ineligible Project Characteristics', 'Projects that Operate as Hotels or Motels', 'Projects Subject to Split Ownership Arrangements', 'Projects that Contain Multi-Dwelling Unit Condos or Co-ops', 'Projects with Property that is not Real Estate', 'Projects that Operate as a Continuing Care Community or Facility', 'Non-Incidental Business Arrangements', 'Commercial Space and Mixed-Use Allocation', 'Recreational Leases and Mandatory Memberships', 'Live-Work Projects', 'Litigation or Pre-litigation Activity', 'Single-Entity Ownership', 'Projects in Need of Critical Repairs' and 'Projects Terminating or Involved in Insolvency Proceedings'. Only the critical-repairs subsection was transcribed in full below; the other twelve were identified by heading but NOT read in full, so this record CANNOT establish what they do or do not require, and must never be cited as evidence that some other characteristic is absent from the topic. PROJECTS IN NEED OF CRITICAL REPAIRS, transcribed verbatim: 'Projects in need of critical repairs are those needing repairs or replacements that significantly impact the safety, soundness, structural integrity or habitability of the project's building(s), or the financial viability or marketability of the project. Critical repairs include conditions such as: material deficiencies, which if left uncorrected, have the potential to result in or contribute to critical element or system failure within one year; any mold, water intrusions or potentially damaging leaks to the project's building(s); advanced physical deterioration; any project that failed to pass state, county, or other jurisdictional mandatory inspections or certifications specific to structural safety, soundness, and habitability; or any unfunded repairs costing more than $10,000 per unit that should be undertaken within the next 12 months (does not include repairs made by the unit owner or repairs funded through a special assessment).' CRITICAL: the parenthetical exclusion on the $10,000 item — that it 'does not include repairs made by the unit owner or repairs funded through a special assessment' — is part of the rule and was MISSING from this repository's earlier fannie-section-registry summary of B4-2.1-03. Do not state the $10,000 figure without it. Note also that the list is introduced by 'include conditions such as', so it is illustrative rather than closed. ILLUSTRATIVE ITEMS: 'Examples of some items to consider include, but are not limited to, sea walls, elevators, waterproofing, stairwells, balconies, foundation, electrical systems, parking structures or other load-bearing structures.' TWO CARVE-OUTS THAT MUST TRAVEL WITH THE RULE: (1) 'If damage or deferred maintenance is isolated to one or a few units and does not affect the overall safety, soundness, structural integrity, or habitability of the project, then these requirements do not apply.' (2) 'Routine repairs are not considered to be critical and include work that is: preventative in nature or part of normal capital replacements (for example, focused on keeping the project fully functioning and serviceable); and accomplished within the project's normal operating budget or through special assessments that are within guidelines.' EVACUATION ORDERS: 'A project with an evacuation order due to an unsafe condition, either for a partial or total evacuation of the project's building(s), is ineligible until the unsafe condition has been remediated and the building(s) is deemed safe for occupancy.' SPECIAL ASSESSMENTS: 'Special assessments may be current or planned.' Lenders must obtain and review, for each special assessment, 'what is the purpose of the special assessment, when was the special assessment approved and is it planned (approved by the unit owners, but not yet initiated by the board) or already being executed, what was the original amount of the special assessment and the remaining amount to be collected, and when is the expected date the special assessment will be paid in full.' The operative consequence is conditional, not automatic: 'If the special assessment is associated with a critical repair and the issue is not remediated, the project is ineligible.' A special assessment is therefore NOT by itself disqualifying. INSPECTION REPORTS: 'If a structural and/or mechanical inspection was completed within 3 years of the lender's project review date, the lender must obtain and review the inspection report. The report cannot indicate that any critical repairs are needed, no evacuation orders are in effect, and no regulatory actions are required.' And: 'If the inspection report indicates there are unaddressed critical repairs, the project is ineligible until the required repairs have been completed and documented accordingly. The lender must review an engineer's report or substantially similar document to determine if the repairs completed have resolved the safety, soundness, structural integrity, or habitability concerns of the project.' DO NOT CONFLATE with B4-2.1-01's separate waiver of a thorough project review, and do not carry any of this across to FHA, VA or USDA, which maintain their own project requirements. doNotAssert: this record does not establish that any particular project is eligible or ineligible, and nothing here is an underwriting determination on a specific building. — Fannie Mae · accessed 2026-10-17
- Full County Loan Limit List 2026 (HERA-based, final), Michigan entries — rows read verbatim from the FHFA file on 2026-10-16 for the first Michigan batch: '26,055,GRAND TRAVERSE COUNTY,MI,45900,"$832,750 ","$1,066,250 ","$1,288,800 ","$1,601,750 "'; '26,065,INGHAM COUNTY,MI,29620,"$832,750 ","$1,066,250 ","$1,288,800 ","$1,601,750 "'; '26,099,MACOMB COUNTY,MI,19820,"$832,750 ","$1,066,250 ","$1,288,800 ","$1,601,750 "'; '26,161,WASHTENAW COUNTY,MI,11460,"$832,750 ","$1,066,250 ","$1,288,800 ","$1,601,750 "'; '26,163,WAYNE COUNTY,MI,19820,"$832,750 ","$1,066,250 ","$1,288,800 ","$1,601,750 "'. CBSA POINTS FOR THIS BATCH: Wayne and Macomb counties are BOTH in CBSA 19820, the Detroit-Warren-Dearborn statistical area, so Detroit and Warren carry an identical conforming limit; Washtenaw County is its own CBSA 11460 (Ann Arbor); Ingham County is CBSA 29620 (Lansing); and Grand Traverse County is CBSA 45900 (Traverse City). All five sit at the 2026 national baseline one-unit limit of $832,750, with $1,066,250 for two units, $1,288,800 for three and $1,601,750 for four. DO NOT CONFUSE THIS SERIES with FHA or Section 184 maximum loan limits, which are set on a different basis, or with the MSHDA sales price limit, which is a programme cap on the PRICE of the home rather than a ceiling on the loan amount. MICHIGAN-WIDE CHECK, performed directly on the downloaded CSV on 2026-10-17 for the second Michigan batch: the file contains exactly 83 rows with State 'MI', and every one of them carries the same limits - one-unit $832,750 (83 of 83), two-unit $1,066,250 (83 of 83), three-unit $1,288,800 (83 of 83), four-unit $1,601,750 (83 of 83). This supports the statement that all eighty-three Michigan counties sit at the 2026 baseline conforming limit. Rows read verbatim for the batch-2 markets: '26,025,CALHOUN COUNTY,MI,12980,$832,750 ,$1,066,250 ,$1,288,800 ,$1,601,750 '; '26,111,MIDLAND COUNTY,MI,33220,$832,750 ,$1,066,250 ,$1,288,800 ,$1,601,750 '; '26,103,MARQUETTE COUNTY,MI,32100,$832,750 ,$1,066,250 ,$1,288,800 ,$1,601,750 '; '26,017,BAY COUNTY,MI,13020,$832,750 ,$1,066,250 ,$1,288,800 ,$1,601,750 '; '26,037,CLINTON COUNTY,MI,29620,$832,750 ,$1,066,250 ,$1,288,800 ,$1,601,750 '. CBSA points for batch 2: Calhoun County is CBSA 12980 (Battle Creek); Midland County is CBSA 33220; Marquette County is CBSA 32100; Bay County is CBSA 13020; East Lansing spans Ingham County (CBSA 29620) and Clinton County (also CBSA 29620, the Lansing-East Lansing area). The CSV's column order is FIPS State Code, FIPS County Code, County Name, State, CBSA Number, One-Unit Limit, Two-Unit Limit, Three-Unit Limit, Four-Unit Limit - note that the CBSA Number precedes the one-unit limit, so reading the fifth field as a dollar figure returns a CBSA code instead. — Federal Housing Finance Agency · accessed 2026-10-17
Sterling Heights — straight answers
- How many condo projects in Sterling Heights are FHA approved?
- Two, as of a live query of HUD's FHA condominium lookup on 17 October 2026. That query returned 55 project records for the city, all of them in Macomb County, and a separate status-filtered query returned exactly 2 with a current status of Approved — Aberdeen Pines Condominiums, whose approval runs to 04/21/2028, and Moravian Manor, whose approval runs to 01/24/2027. Approval statuses and expiration dates change, so re-check before you rely on either. One caveat belongs with any search of that database, in the words of the data service we queried it through rather than HUD's: "Most condos were never submitted to HUD, so no record usually means not FHA approved."
- Does that mean I cannot buy a condo here?
- No, and this is the distinction worth carrying into every conversation about an attached home. FHA condominium approval and Fannie Mae's conventional project review are separate regimes run by different entities. A project's FHA status — Approved, Expired, Rejected — says nothing about how a conventional loan would treat it. If FHA financing is not available on a particular building, the conventional route is a different question with different rules. The data service we queried also notes that "Single-unit approvals may still be possible — verify on HUD before locking a loan."
- What does "Expired" mean on a HUD record?
- It means the project was approved and the approval has lapsed rather than been refused. Thirty of the 55 Sterling Heights records carry that status, on HUD's own status-filtered count, and their status dates reach back as far as 1982. An expired approval is a different situation from a rejection, and it is worth asking about rather than treating as a closed door.
- Does Fannie Mae review every condo project?
- No, but read the waiver carefully, because it is narrower than the shorthand. The governing topic is B4-2.1-02, which opens "Fannie Mae does not require a thorough project review for the project types and transactions described in the following table." The word doing the work is "thorough". The table covers a detached condo unit; a "Unit in a two- to four-unit condo project"; a "Unit in a five- to ten-unit condo project that is not part of a larger development or master association"; a unit in a PUD project, "except for PUD projects consisting of manufactured homes subject to a community land trust, ground lease, or shared equity arrangement"; and a Fannie Mae to Fannie Mae limited cash-out refinance "with a maximum loan-to-value ratio of 80% (CLTV or HCLTV ratios may be higher)". Separately, Fannie Mae "waives the project review requirements for high LTV refinance loans secured by units in a condo, co-op, or PUD project."
- If the review is waived, does anything still apply to the project?
- Yes — eight things, and this is the part the shorthand loses. B4-2.1-02 lists them: property eligibility requirements under Chapter B2-3; the project is not in Condo Project Manager with a status of "Unavailable"; the project is not a condo hotel or motel, houseboat project, or a timeshare or segmented ownership project; the priority-of-common-expense-assessments rules; any appraisal obtained must meet all applicable appraisal requirements; insurance requirements under Subpart B7; no unaddressed critical repairs or evacuation orders — a requirement written for Fannie Mae to Fannie Mae limited cash-out refinances, with its own project-size qualifier; and the project is not terminating and not involved in insolvency proceedings. So a waived review is not a project with no conditions attached.
- Does one manufactured home in the project matter?
- It can defeat the waiver outright, which is worth knowing before you assume you are inside it. B4-2.1-02 states: "Exception to the waiver policy: Other than the PUD requirements above, if the property is a manufactured home or the project contains any manufactured homes, such property or project is not eligible for a review waiver and must be reviewed based on the applicable manufactured home project review requirement." Note "contains any manufactured homes" — one is enough.
- So a home in a planned community does not need a thorough project review?
- Units in a PUD project are within the waiver, subject to the manufactured-home provisions above, and B4-2.3-01 sets out the requirements that do apply to PUD units. Two distinctions matter. The waiver is of a thorough project review, not of the eight requirements listed above. And the separate requirement that a property in a condo, co-op or PUD project must meet Fannie Mae's project standards is not the same thing as requiring a thorough project review — treating the two as one overstates the obstacle, and treating the waiver as total understates what still has to be true.
- What actually makes a project ineligible?
- Its condition and finances, more than its paperwork. B4-2.1-03 defines projects in need of critical repairs as "those needing repairs or replacements that significantly impact the safety, soundness, structural integrity or habitability of the project's building(s), or the financial viability or marketability of the project", and lists conditions "such as" material deficiencies that could contribute to critical element or system failure within one year, mold, water intrusion or damaging leaks, advanced physical deterioration, and failure to pass mandatory structural-safety inspections. The topic has thirteen subsections in total, covering matters from hotel-like operation to litigation and single-entity ownership, so this is one ground among several rather than the whole list.
- Is there a dollar threshold for repairs?
- There is, and it comes with an exclusion that must travel with it. The rule reads "any unfunded repairs costing more than $10,000 per unit that should be undertaken within the next 12 months (does not include repairs made by the unit owner or repairs funded through a special assessment)." Two further carve-outs sit in the same section: where "damage or deferred maintenance is isolated to one or a few units and does not affect the overall safety, soundness, structural integrity, or habitability of the project, then these requirements do not apply", and routine repairs are not critical, meaning work "preventative in nature or part of normal capital replacements" that is "accomplished within the project's normal operating budget or through special assessments that are within guidelines."
- Does a special assessment kill the deal?
- Not by itself. The consequence in B4-2.1-03 is conditional: "If the special assessment is associated with a critical repair and the issue is not remediated, the project is ineligible." The lender must first establish the assessment's purpose, when it was approved and whether it is planned or already being executed, its original and remaining amounts, and when it is expected to be paid in full. An assessment funding ordinary capital replacement is a different thing from one funding an unresolved critical repair.
- What about an inspection report or an evacuation order?
- Both are addressed directly. Where "a structural and/or mechanical inspection was completed within 3 years of the lender's project review date, the lender must obtain and review the inspection report", and that report "cannot indicate that any critical repairs are needed, no evacuation orders are in effect, and no regulatory actions are required." An evacuation order makes a project "ineligible until the unsafe condition has been remediated and the building(s) is deemed safe for occupancy." Where an inspection shows unaddressed critical repairs, the project stays ineligible until they are completed and documented.
- What should I ask before making an offer on an attached home?
- Six things, and an HOA can generally be asked for all of them. Whether the project is a condominium or a PUD, since that changes whether a thorough review applies at all. How many units the project contains, and whether it is part of a larger development or master association, because a five- to ten-unit project that is must be reviewed using the Full Review method. Whether the project contains any manufactured homes, since one is enough to defeat the waiver. Whether any special assessment is current or planned, and what it pays for. Whether a structural or mechanical inspection has been done in the last three years, and what it found. And the project's FHA status on HUD's own lookup, which matters if FHA financing is your route.