Where to live · Oregon

Redmond, OR

The house does not have to be finished to close — but which escrow figure applies depends on whose loan it is, and VA's is not Fannie Mae's.

New construction is a familiar part of the Redmond market, and it brings a question an existing-home purchase does not: what happens when the house is not quite done on the day you are meant to close. Fannie Mae does allow a loan to be sold before improvements are complete, under a table headed "Requirements for New or Proposed Construction": completion within 180 days of the note date, a completion escrow of 120% of the estimated cost, and a cost of completion no greater than 10% of the "as completed" appraised value. Those are Fannie Mae's figures. VA runs its own arrangement for postponed exterior onsite improvements, and VA Form 26-1849 escrows the cost plus one-half of the cost — one and a half times, minimum, where an escrow is used at all. Which applies depends on which loan you are getting.

Short version: a loan can be sold before the improvements are finished, but under a narrow rule — and the rule depends on whose loan it is. For a loan sold to Fannie Mae, the governing table is headed “Requirements for New or Proposed Construction”: 180 days from the note date, a completion escrow of 120% of the estimated cost, and a cost of completion no greater than 10% of the “as completed” appraised value, with a guaranteed fixed-price contract replacing the 120% with the contract price. For a VA loan, postponed exterior onsite improvements use VA Form 26-1849, whose schedule escrows the cost plus one-half of the cost — one and a half times, minimum. Whether an escrow is required at all is a separate question governed by VA’s Lender’s Handbook, which this page has not read. Ask which set applies, and whether it applies, before planning around either.

The default, and the exception

The default is simple: “Generally, improvements, alterations, and repairs on the subject property must be complete when the loan is sold to Fannie Mae.”

The exception matters wherever new construction is part of the market, because construction schedules slip. Fannie Mae does allow a loan to be sold before completion — if the lender follows the postponed-improvements requirements.

The three numbers that decide it — on a Fannie Mae loan

Requirement The rule (Fannie Mae)
Time Postponed improvements “must be completed within 180 days of the note date”
Escrow Withhold from purchase proceeds “funds equal to 120% of the estimated cost for completing the improvements”
Size of what’s left “The cost of completing improvements must not represent more than 10% of the ‘as completed’ appraised value”

The third is the one buyers overlook and the one most likely to be decisive. It is not a rule about how long the builder has — it is a rule about how much house can still be missing. A home that is substantially unfinished does not qualify for this treatment at all, however good the reason.

The exception worth negotiating for. The section provides that “if the contractor or builder offers a guaranteed fixed-price contract for completion of the improvements, the funds in the completion escrow only need to equal the full amount of the contract price.” That removes the 20% cushion. Whether your builder will offer one is a question to ask while you still have leverage — before signing, not at closing.

What actually counts as a postponable item

The item must:

  • be part of the sales contract — and the section says plainly that “third-party contracts are not permissible”;
  • be postponed “for a valid reason, such as inclement weather or a shortage of building materials”; and
  • not affect the ability to obtain an occupancy permit.

Central Oregon winters and materials availability are both recognised reasons on their face. “The builder is behind” is not the same thing, and a separate contract with a third party to finish the work does not fit the rule at all.

Hero’s read: there is no single “completion escrow rule”, and that is the thing worth taking away. 120% is Fannie Mae’s. 150% is VA’s minimum, set out on VA Form 26-1849 as the cost plus one-half of the cost. A figure quoted at you is not wrong because it is not 120% — it may be the right figure for a different loan, or a lender’s own overlay on top, which is legitimate. For a firefighter or veteran buyer using VA entitlement on a new build, 150% is a real VA figure, not a misquote — it is the minimum the VA escrow form itself sets out. What the form does not tell you is when an escrow is required at all; that sits in VA’s Lender’s Handbook, which we have not opened, and which is reported to exempt small postponed items below a dollar threshold. So ask your lender both questions: whose rule, and whether an escrow is needed here at all.

Proving it was finished

Completion is normally confirmed on Form 1004D, the Appraisal Update and/or Completion Report. The appraiser may complete it from an on-site visual inspection, or by alternative methods — virtual inspections, digital photos, site videos — provided the documentation includes visually verifiable exhibits that are unaltered and authenticable by metadata and the property’s geocode.

An attestation letter is also permitted for new or proposed construction: a letter from borrower and builder confirming the property “was completed and constructed in conformity with the plans and specifications, amendments, and change orders.” If a letter signed by both parties cannot be obtained, a Form 1004D by the appraiser is required instead.

Note one carve-out: the alternative Form 1004D method and attestation letters are not permitted for HomeStyle Renovation transactions.

The Fannie Mae escrow has conditions of its own

  • A custodial account meeting Fannie Mae’s criteria.
  • A signed escrow agreement stating how the account is managed and how funds are disbursed.
  • The escrow “may not adversely affect the mortgage insurance or title insurance.”
  • A final title report showing no outstanding mechanic’s liens, and no exceptions taken to the postponed improvements or the escrow agreement. If the report issues before completion, an endorsement ensuring lien priority is required.
  • After a satisfactory completion report, the lender releases the final draw, including any funds above what the work cost.

The appraisal, before the house exists

For new or proposed construction the appraisal “must be based on either plans and specifications, an existing model home, or other information sufficient to identify its quality and character to accurately report the interior features of the proposed improvements.” The property must also be the highest and best use “as improved (or as proposed per plans and specifications)”.

Practical consequence: the plans you sign are the plans the appraisal rests on. Change orders are not paperwork — they are a change to the thing being valued.

What to establish before you sign the builder contract

  1. Whether the builder will provide a guaranteed fixed-price completion contract.
  2. What the contract says about delay, and who carries the cost of it.
  3. Whether anything likely to be outstanding would affect the occupancy permit — because that disqualifies it.
  4. How change orders are documented, since they reach the appraisal.
  5. Roughly what proportion of value could still be incomplete, against the 10% ceiling.

The county picture

For 2026 FHFA puts Deschutes County at the $832,750 one-unit national baseline, with $1,066,250 for two units, $1,288,800 for three and $1,601,750 for four. In a county where prices have moved considerably, that ceiling arrives sooner than people expect — Bend sets out what happens at and above the line, and why the limit is measured against the loan amount rather than the purchase price.

On USDA, Deschutes sits in the Bend-Redmond, OR HUD Metro FMR Area, where the FY 2026 guaranteed-loan income limit is $138,200 for a one- to four-person household and $182,450 for five to eight — noticeably higher than Oregon’s non-metro counties. Area eligibility is still an address-level determination, which Klamath Falls explains.

A note on comparables: in a market with a lot of recent construction, the appraiser’s comparable selection can lean on newly built homes, and guidance recognises that the most appropriate comparables are not always the most recent. Klamath Falls covers the thin-market version of that problem.

Who it fits

Redmond fits buyers who will settle the completion question in the contract rather than at the closing table. For the conforming limit in the same county, see Bend; for resort-community assessments and project eligibility nearby, Sunriver; for why a county sharing this conforming limit can still sit in a different USDA income area, Prineville; for Oregon’s own down payment assistance, Salem. Get the statewide picture in the Oregon mortgage guide or the Oregon relocation guide.

Redmond, Oregon — not Redmond, Washington. Both exist and both have housing markets. This page is Deschutes County. The Washington one is Redmond, WA.

Where to go next

Talk With Jason about a Redmond purchase, or call (561) 468-HERO.

Is Redmond a fit?

Who Redmond may fit

Buyers around Redmond and the Deschutes County new-construction market who want to know, before they sign a builder contract, what their options are if the house is not finished on time.

Who may prefer elsewhere

Buyers whose question is about the land rather than the building should read Grants Pass on private roads and legal access, and McMinnville on zoning and parcel size.

Nearby cities to compare
Market snapshot

Redmond housing market

Live market data (median price, inventory, days on market) connects here once a verified source is wired for redmond-or. No figures are shown until then.

Financing · Hero Mortgage Group

Found the place? Now build the financing plan.

Hero Mortgage Group is a firefighter-owned brokerage licensed in Oregon. On a Redmond new-construction purchase the useful work happens before the builder contract is signed — establishing whether a guaranteed fixed-price completion contract is available, and what the completion position would be if the schedule slips.

Hero Relocation Plan

Not ready to buy yet? Build your Hero Relocation Plan.

You don’t have to be ready today. Tell us where you’re considering, when, and what matters to your family — we’ll help you organize the next steps at your pace.

Start planning your move →

Educational, no-pressure. This is planning help toward a future move — not a sales call.

Sources
Common questions

Redmond — straight answers

Can I close on a house that is not finished?
Sometimes, under a specific set of conditions — and which conditions depends on the loan. The detailed rules described here are Fannie Mae's conventional guidance. For VA we have read VA Form 26-1849 itself, which is what the escrow figure on this page comes from; we have not opened VA's Lender's Handbook, which is what governs when an escrow is required in the first place, so treat the VA detail here as the form's terms rather than the whole VA rule. FHA and USDA completion and repair-escrow rules were not verified here at all, and an individual lender may be stricter than any of them. The general rule is that "improvements, alterations, and repairs on the subject property must be complete when the loan is sold to Fannie Mae." But Fannie Mae does allow a loan to be sold before completion where the lender follows the postponed-improvements requirements. Those requirements are set out in a table headed "Requirements for New or Proposed Construction", and they are specific rather than general permission.
What are the actual limits?
Three numbers matter, and all three are Fannie Mae's — a VA loan uses a different basis, covered below. For a loan sold to Fannie Mae: the postponed improvements must be completed within 180 days of the note date. The lender must establish a completion escrow by withholding from the purchase proceeds funds equal to 120% of the estimated cost of completing the improvements. And the cost of completing the improvements must not represent more than 10% of the "as completed" appraised value of the property. That third one is the limit people forget, and it is the one most likely to rule out a half-finished house.
I have read the escrow is 150%. Which figure is right?
Both can be, for different loans, and that is the honest answer. For a loan sold to Fannie Mae the figures in this section are 120% of the estimated cost and 180 days from the note date. For a VA loan, postponed exterior onsite improvements run through VA Form 26-1849, whose schedule adds "one-half of amount shown in line 11 (minimum)" to the total cost to reach the total escrowed, and describes the allocation as one and a half times the cost as a minimum. So 150% is not a misquote of the Fannie Mae rule — it is the minimum VA's own form sets out. Two caveats on the VA side: that form covers exterior onsite improvements specifically, and whether an escrow is required at all is governed by VA's Lender's Handbook, which we have not opened and which is reported to exempt small items below a dollar threshold. A 30-to-90-day window does not match the Fannie Mae section, which says 180 days. And a lender may apply its own overlay on top of whichever set governs. Ask which programme your figure comes from, and whether an escrow is needed at all.
Is there any way to avoid the 120% withholding?
Yes, on the Fannie Mae path. That section provides that "if the contractor or builder offers a guaranteed fixed-price contract for completion of the improvements, the funds in the completion escrow only need to equal the full amount of the contract price." A guaranteed fixed-price contract therefore removes the 20% cushion. This is a Fannie Mae provision; it does not describe VA's escrow form, which sets its own minimum. That is a question to put to your builder early rather than at closing.
What kinds of unfinished items qualify?
Narrower ones than the permission itself suggests. Acceptable postponed items must be part of the sales contract — the section states expressly that "third-party contracts are not permissible" — must be postponed for a valid reason, "such as inclement weather or a shortage of building materials", and must not affect the ability to obtain an occupancy permit. Central Oregon weather is a real and recognised reason. A builder simply running behind on finishes is a different conversation.
How is completion proved afterwards?
Usually with Form 1004D, the Appraisal Update and/or Completion Report. The appraiser can complete it from an on-site visual inspection, or by alternative methods such as virtual inspections, digital photos or site videos, provided the documentation includes visually verifiable exhibits that are unaltered and can be authenticated by metadata and the property geocode. A borrower and builder attestation letter is also permitted for new or proposed construction, confirming the property was completed in conformity with the plans, specifications, amendments and change orders — but if a letter signed by both parties cannot be obtained, a Form 1004D by the appraiser is required.
Does the escrow affect anything else?
Several things, and they are all worth checking. The escrow must sit in a custodial account meeting Fannie Mae's criteria, lender and borrower must execute an escrow agreement setting out how it is managed and disbursed, and the escrow "may not adversely affect the mortgage insurance or title insurance." The lender must also obtain a final title report showing no outstanding mechanic's liens and no exceptions to the postponed improvements or the escrow agreement. After a satisfactory completion report the lender releases the final draw, including any funds left over.
How does the appraisal work before the house exists?
For new or proposed construction the appraisal "must be based on either plans and specifications, an existing model home, or other information sufficient to identify its quality and character to accurately report the interior features of the proposed improvements." The property must also be the highest and best use "as improved (or as proposed per plans and specifications)". So the plans you sign are the plans the appraisal rests on, and change orders matter.
What is the conforming loan limit in Redmond?
Deschutes County carries the national baseline for 2026 — $832,750 for one unit, $1,066,250 for two, $1,288,800 for three and $1,601,750 for four, from FHFA's county file. In a county where new construction prices have moved a long way, that ceiling arrives sooner than buyers expect, which is the subject of the Bend guide.
Is a USDA loan an option around Redmond?
Possibly, and the income limit here is higher than in Oregon's non-metro counties. USDA groups Deschutes County into the Bend-Redmond, OR HUD Metro FMR Area, where the FY 2026 guaranteed-loan limit is $138,200 for a one- to four-person household and $182,450 for five to eight. Whether a specific property sits in a designated eligible area is a separate, address-level determination.