Above an active longwall mine Pennsylvania law puts the obligations on the coal company — repair or compensation, relocation expenses, water supply replacement, and a two-year claim deadline — but the much-quoted 24-hour temporary water duty is conditional, the choice between repairing and paying is the operator's rather than yours, and denying access to a survey can relieve the operator of that duty for structure damage.

Greensburg covers the Commonwealth's insurance programme for abandoned mines. Washington County is the other half of the picture, because mining here is still happening. Where a property sits above an active longwall mine, the Bituminous Mine Subsidence and Land Conservation Act gives the surface owner rights against the coal operator rather than a policy to buy. DEP enumerates ten of them, including six months' notice before mining, a pre-mining survey, water supply replacement, and repair to pre-mining condition at the company's expense. Two details DEP's plain-language page leaves out matter as much as the rights themselves. The widely quoted 24-hour temporary water duty is conditional on three things under the regulation, and denying access to a survey can relieve the operator of the duty to repair or compensate for structure damage, subject to a stated exception. DEP's published list of municipalities with active longwall mines names South Strabane, North Strabane and a dozen more, but not the City of Washington — which is an indicator of where permits have existed, not the test for whether a given parcel is undermined.

Short version: Where a property is undermined by an active longwall mine, Pennsylvania law gives the surface owner rights against the coal company rather than a policy to buy — six months’ notice, a pre-mining survey, water supply replacement, repair to pre-mining condition at the company’s expense, and a claim window of two years. Two things to get right: the much-quoted 24-hour temporary water duty applies only when three conditions hold, and refusing the pre-mining survey has a statutory consequence. What engages the rights at all is whether your parcel is affected by mining, which DEP answers by address — the municipality list is an indicator of where permits have existed, not the test.

Active mining is a different mechanism from abandoned mining

Greensburg covers the Commonwealth’s Mine Subsidence Insurance, which exists because abandoned workings are not covered by a homeowner’s policy. That is a product you buy.

This is not that. Where mining is permitted and active, DEP opens its guidance by saying that “Residents living above longwall coal mines are entitled to certain rights and protections under the law”, and its agents “advise you of your rights under the Bituminous Mine Subsidence and Land Conservation Act and assist you in settling damage claims.” The obligations sit with the operator.

These are not alternatives you choose between. Which one bears on a particular property depends on whether the workings beneath it are abandoned or active — a question for DEP about that address, not something to reason out from a city name. DEP runs a dedicated programme here: it says Pennsylvania “is the first state in the nation to dedicate staff for the sole purpose of helping surface property owners with subsidence damage”, with Surface Subsidence Agents covering Greene and Washington counties and a toll-free line on 800-922-1678.

What the coal company owes, in DEP’s own words

Notice Notified when mining is proposed and able to comment during DEP’s permit review; then, if approved, “at least six months before mining occurs under your property”
Pre-mining survey A right, “to record the existing condition of your home and water supply to help identify damage or loss of water”
Water loss DEP’s summary: “a temporary replacement supply within 24 hours and a prompt permanent replacement - paid for by the coal company”. The regulation attaches three conditions to the 24-hour part — see below
Can’t live there “the right to have your temporary relocation expenses paid by the coal company”
Damage A post-mining survey, and damage “repaired to pre-mining condition - paid for by the coal company - or to accept compensation” (see the row below on who elects)
Claim deadline “up to two years after the date the damage occurred”
Repair or compensation § 89.142a(f)(1): the operator “shall promptly and fully rehabilitate, restore, replace or compensate”. Which one is the operator’s election, not the owner’s — DEP’s “if you choose” is looser than the regulation

Two of those deserve emphasis for anyone buying here.

The 24-hour water duty, and its three conditions. For a property on a well rather than public water this is the sentence we would point to first — and DEP’s plain-language page states it without the qualifications the regulation attaches. 25 Pa. Code § 89.145a(e)(1) is the operative text:

If the affected water supply is within the rebuttable presumption area and the rebuttable presumption applies and the landowner or water user is without a readily available alternate source, the operator shall provide a temporary water supply within 24 hours of being contacted by the landowner or water supply user or the Department, whichever occurs first.

Three conditions, all of which have to hold. The 24-hour clock is real but not unconditional, and whether a property sits inside a rebuttable presumption area is a question for DEP about that address and that mine. Outside that frame the duty still exists in another form: § 89.145a(e)(2) requires an operator to “promptly provide a temporary water supply” for an EPACT water supply where mining is found to have caused the problem and there is no readily available alternate source — and that one “applies regardless of whether the water supply is located within, or outside of, the rebuttable presumption area”. Promptly, rather than within 24 hours.

One 24-hour clock not to confuse with the other. § 89.145a(c) provides that “Within 24 hours of an operator’s receipt of a claim of water supply contamination, diminution or interruption, the operator shall notify the Department of the claim.” That is the operator’s duty to tell DEP, not a duty to deliver water.

The permanent replacement is the larger entitlement. § 89.145a(b) requires the operator to “promptly restore or replace the affected water supply with a permanent alternate source which adequately serves the premining uses of the water supply and any reasonably foreseeable uses”, and § 89.145a(f) defines adequate: as reliable and as permanent as before, no excessive maintenance, equivalent control and accessibility, quality meeting the Pennsylvania Safe Drinking Water Act or comparable to premining where it did not, sufficient quantity, the necessary piping, pumping and treatment installed — and no increase in running costs to you, the operator owing “the permanent payment of the increased operating and maintenance cost” where there is one.

Do not refuse the survey. We would have called this a right worth taking; the regulation makes it more than that. § 89.145a(a)(1) requires the operator to survey “except when the landowner denies the operator access to the site to conduct a survey and the operator has complied with the notice procedure in this section”, and § 89.145a(a)(3) sets out that procedure — the operator must show DEP that it notified the landowner by certified mail or personal service of their rights and “the effect on the landowner of the landowner’s denial to the operator of access to the site” under the Bituminous Mine Subsidence and Land Conservation Act, and that “The landowner failed to authorize access to the operator to conduct a survey within 10 days of receipt of the operator’s notice of intent to conduct a survey.”

And for structures, § 89.144a says what refusal costs. The operator “will not be required to repair a structure or compensate a structure owner for damage” where it demonstrates to DEP that the landowner denied access for a premining or postmining survey, that it then served notice by certified mail or personal service identifying the owner’s rights, and that “The landowner denied the operator access to the site to conduct the survey within 10 days after the landowner’s receipt of the notice.”

Two qualifications belong with that, because the relief is not absolute. § 89.144a(b) provides that it “will not apply in the case of an EPACT structure if the landowner or the Department can show, by a preponderance of evidence, that the damage resulted from the operator’s underground mining operations.” And § 89.144a(c) operates separately and by apportionment: the operator “is not responsible for the portion of structure damages which the operator can show … could have been prevented had the structure owner provided the operator access to conduct a premining survey … and implement necessary and prudent damage minimization measures.” So even short of total relief, refusing access can shift part of the cost onto the owner.

We have not read BMSLCA § 5.2(d), the parallel provision for a water supply rather than a structure, so we say nothing about what refusal costs there. For structures the position is clear enough: refusing the survey is not a neutral choice. The obligation runs the other way too, on two different clocks: for water analyses the operator must give you and DEP the results “within 30 days of their receipt by the operator” (§ 89.145a(a)(2)), while for a structure survey the results go to the landowner “within 30 days of completion” (§ 89.142a(b)(1)(iii)).

The two-year claim deadline. DEP’s warning is unambiguous: “If you do not file a damage claim with DEP within two years, you may forfeit your rights to repair or compensation.” DEP states the trigger as “the date the damage occurred”; we have not read the statutory claim-timing provisions, so we will not gloss that further than DEP does. A pre-mining survey is what makes a later claim provable, and refusing access to it carries a statutory consequence rather than simply forgoing a benefit — see the survey note above.

DEP also notes the practical help: its agents can “help you deal with the coal company to ensure any damage or water loss you experience is corrected promptly and that temporary water supplies are brought in right away”, and it publishes a fact sheet on water supply replacement and subsidence damage repair.

Where permits have existed — an indicator, not the test

DEP publishes a table of municipalities with active longwall mines. In Washington County it names:

  • Consol Bailey Mine — West Finley Twp
  • Consol Enlow Fork Mine — West Finley Twp, East Finley Twp, Morris Twp
  • Consol Mine 84 — South Strabane Twp, North Strabane Twp, Somerset Twp, Amwell Twp, North Bethlehem Twp, West Bethlehem Twp, Cokeburg Boro, Beallsville Boro, West Pike Run Twp, Ellsworth Boro, Bentleyville Boro, Fallowfield Twp
  • Maple Creek Mine — Nottingham Twp, North Strabane Twp, Somerset Twp, Fallowfield Twp, Carroll Twp, New Eagle Boro, City of Monongahela
  • UMCO Energy High Quality Mine — Carroll Twp

The City of Washington is not on that list. The only city named anywhere in DEP’s table is the City of Monongahela. Yet South Strabane Township and North Strabane Township — which adjoin the city — both are.

That is worth knowing, and it is worth being careful about what it means. A search a buyer would describe as “Washington, PA” can land in a municipality DEP lists or one it does not. But the list is not the test. DEP addresses these rights to residents living above longwall mines and to owners whose property is proposed to be mined under — so the operative question is whether the specific parcel is affected by underground mining, not whether its municipality appears in a table. A listed municipality does not mean a given parcel inside it is undermined, and an unlisted one does not mean no parcel inside it is. Only DEP and the permit record answer that, for an address. Carlisle covers a case where the municipality genuinely is the operative fact, because there it drives the millage.

One inference to refuse. Absence from DEP’s active-mining list does not mean a property has no mining exposure. That list is about active longwall mines. Abandoned workings are a separate matter, and DEP’s general statement is that “Millions of structures in Pennsylvania are located over old, abandoned underground coal and clay mines.” A property can be outside every active permit and still sit over something abandoned — which is the insurance question, covered on Greensburg, and which DEP answers by address through its risk map and site-specific request process.

And a limit on the list itself, which cuts both ways. DEP’s table names operators including “RAG” and “UMCO Energy, Inc.” and the page we read carries no revision date. We reproduce it as published and make no claim that every mine or operator on it is currently operating — nor that it is a complete or current enumeration of longwall mining in either county. A list of uncertain age can retain mines that have closed and omit permits granted since. That is a second reason not to treat it as the answer: current and proposed mining status for an address comes from DEP, on 800-922-1678 or through a Surface Subsidence Agent.

What we are not going to tell you about lenders

Nothing on DEP’s pages states that a mortgage lender requires anything — not coverage, not a survey, not a disclosure — because a property is in a permitted mining area. These pages establish what the operator owes a surface owner. That is a different question from what a lender will ask for, and the second is not answerable from the first. If you want it asked directly of the lender at application rather than discovered at underwriting, that is the kind of thing worth routing to a human; see Pennsylvania mortgage options.

The loan side, and a designation worth knowing

PHFA gives Washington County the “(T)” Target designation, and that does two things at once:

  • The Keystone Home Loan purchase price limit is $650,900, with income limits of $132,400 and $154,500.
  • The first-time buyer requirement does not apply at all.

Washington and Fayette share the highest purchase price limit printed in PHFA’s Region 5. Across all six regions of the appendix only Philadelphia’s $730,600 is higher, so this is a high limit by Commonwealth standards rather than merely a local one. For a repeat buyer the designation matters more than the ceiling: Scranton covers what a Target county does in practice, and Butler is the contrast — a Region 5 county at $523,000 with no Target designation and no targeted tract anywhere in it. The full PHFA mechanics are on Allentown.

These figures come from the appendix headed “Effective for reservations on or after 7/1/2026”. PHFA revises it, so confirm the current version rather than a remembered number.

The city these rules land in

Washington’s population was 13,377 at the July 2025 Census Bureau estimate, up 1.8% from the 2020 estimate base, across 6,023 households in 2.92 square miles. Owner-occupancy is 44.6%, the median owner-occupied home value $128,200, median monthly owner costs with a mortgage $1,198 and without one $513, median gross rent $910, and median household income $52,975. Mean travel time to work is 18.7 minutes and the Census Bureau counts 863 veterans.

Of the four Pennsylvania markets added in this batch — Washington, Wilkes-Barre, Lancaster and Stroudsburg — Washington has the lowest monthly owner costs with a mortgage, the lowest median gross rent, the shortest mean commute and the fewest persons per household at 1.94. Those comparisons are limited to these four places and are not state or national rankings.

On the 1.8% increase: it is a published estimate change and the Bureau’s table states no cause. We are not attributing it to mining, to any employer or to migration, because the data does not say.

A note on the data: QuickFacts returned the “X” flag — not applicable — for Housing Units, Building Permits and every row in the business-statistics block, and the “D” flag — suppressed to avoid disclosing confidential information — for transportation and warehousing receipts. Those are absences of an applicable figure rather than zeros. The median value is a 2020-2024 estimate of what existing owners report, not a current market price, and is not measured on the same basis as a PHFA purchase price limit.

What this page cannot tell you

  • Whether a specific parcel is or will be undermined. That is DEP and the permit record, by address.
  • Whether a specific parcel is within a permitted or proposed mining area, which is what engages these rights. DEP and the permit record answer that; the municipality list does not.
  • Whether DEP’s mine and operator list is current. The page carries no revision date.
  • Whether your lender has conditions for a property in a mining area. Nothing DEP publishes establishes that.

What it should do is make the difference between an active-mining right and an abandoned-mine policy clear before you need either. If you want the municipality, the mining status and the Target designation settled before an offer, see Pennsylvania mortgage options, low-down-payment options, or our first-time buyer guide.

Is Washington a fit?

Who Washington may fit

Buyers in and around Washington County who need to know whether a property sits in an active longwall mining municipality, and what that changes about who pays for damage.

Who may prefer elsewhere

Buyers whose question is insurance for abandoned mines rather than rights against an active operator should read Greensburg; buyers who want transfer tax rates municipality by municipality should read Bethel Park.

Nearby cities to compare
Market snapshot

Washington housing market

Live market data (median price, inventory, days on market) connects here once a verified source is wired for washington-pa. No figures are shown until then.

Financing · Hero Mortgage Group

Found the place? Now build the financing plan.

Hero Mortgage Group is a firefighter-owned brokerage licensed in Pennsylvania, working remotely from Florida. If a property you are considering is in a permitted mining area, the municipality and the mining status are worth establishing before an offer — and Washington County's Target designation is worth knowing about before you assume a first-time buyer test applies.

Hero Relocation Plan

Not ready to buy yet? Build your Hero Relocation Plan.

You don’t have to be ready today. Tell us where you’re considering, when, and what matters to your family — we’ll help you organize the next steps at your pace.

Start planning your move →

Educational, no-pressure. This is planning help toward a future move — not a sales call.

Sources
Common questions

Washington — straight answers

What is the difference between this and the mine subsidence insurance on the Greensburg page?
They address different situations and they are not alternatives you choose between. The Commonwealth's Mine Subsidence Insurance programme covers damage from the collapse of abandoned underground coal and clay mines, and DEP sells it because "homeowner's insurance usually does not include it." The rights set out here apply where mining is active and permitted, and they run against the coal company under the Bituminous Mine Subsidence and Land Conservation Act. Which one is relevant to a specific property depends on whether the mine beneath it is abandoned or active, and that is a question for DEP about that address.
What does the coal company actually owe me if mining damages my house?
DEP states it as a right rather than a courtesy. "If your home is damaged, you have the right to a post-mining survey to determine the scope of the damage and to have that damage repaired to pre-mining condition - paid for by the coal company - or to accept compensation." Separately, "If you cannot occupy your home because of mine subsidence damage, you have the right to have your temporary relocation expenses paid by the coal company", and section 89.142a(f)(2)(ii) requires the operator to compensate occupants "for reasonable, actual expenses incurred during their temporary relocation, if the occupants of a damaged structure are required to relocate", plus other agreed or Department-approved incidental costs. One correction to DEP's own wording, which says you may "be fully compensated for structural damage or water supply impacts if you choose." The regulation gives the owner no such choice. Section 89.142a(f)(1) obliges the operator to "promptly and fully rehabilitate, restore, replace or compensate the owner", and section 89.142a(f)(2)(i) frames the alternative from the operator's side — "If, rather than repair the damage, the operator compensates the structure owner". You are entitled to repair or compensation; which one is the operator's election. Where it pays instead of repairing, compensation must equal "the reasonable cost of repairing the structure or, if the structure is determined to be irreparably damaged ... the reasonable cost of its replacement."
What happens if mining takes my water supply?
DEP's plain-language page says you have "the right to a temporary replacement supply within 24 hours and a prompt permanent replacement - paid for by the coal company." The regulation is narrower on the 24-hour part and it matters. 25 Pa. Code section 89.145a(e)(1) applies it only where the supply "is within the rebuttable presumption area and the rebuttable presumption applies and the landowner or water user is without a readily available alternate source." Three conditions, all of which must hold. Where they do not, section 89.145a(e)(2) still obliges an operator to "promptly provide a temporary water supply" for an EPACT water supply regardless of the presumption area — promptly, not within 24 hours. Whether a property is in a presumption area is a question for DEP about that address and that mine.
What about a permanent fix, not a temporary one?
That is the larger entitlement. Section 89.145a(b) requires the operator to "promptly restore or replace the affected water supply with a permanent alternate source which adequately serves the premining uses of the water supply and any reasonably foreseeable uses." Section 89.145a(f) then defines adequate: as reliable and as permanent as the previous supply, no excessive maintenance, as much control and accessibility as before, quality meeting the Pennsylvania Safe Drinking Water Act or comparable to premining where it did not, sufficient quantity, and the necessary piping, pumping and treatment installed. It must also not cost you more to run, and where it would, the operator owes "the permanent payment of the increased operating and maintenance cost."
Can I refuse the pre-mining survey?
You can, but it is not a free choice and we would not advise it. Section 89.145a(a)(1) requires the operator to survey "except when the landowner denies the operator access to the site to conduct a survey and the operator has complied with the notice procedure in this section", and section 89.145a(a)(3) requires an operator who was refused to show DEP that it notified the landowner of their rights "and the effect on the landowner of the landowner's denial to the operator of access to the site" under the Bituminous Mine Subsidence and Land Conservation Act, and that "The landowner failed to authorize access to the operator to conduct a survey within 10 days of receipt of the operator's notice of intent to conduct a survey." Section 89.144a then states the cost for structures. The operator "will not be required to repair a structure or compensate a structure owner for damage" where it shows DEP that access was denied, that it served the prescribed notice, and that access was still denied within ten days of receipt. That relief is not absolute. Section 89.144a(b) excludes an EPACT structure where the landowner or DEP shows by a preponderance of evidence that mining caused the damage, and section 89.144a(c) separately relieves the operator of "the portion of structure damages" that a survey and prudent minimisation measures could have prevented. We have not read the parallel provision for water supplies, so we say nothing about that. For structures, refusing access clearly works against you.
Will I know before mining happens under my property?
Yes, and the notice period is specific. You have "The right to be notified by the coal company when mining is proposed under your property and to comment on the proposed mining during DEP's review of the permit", and if the permit is approved, "the right to be notified by the coal company at least six months before mining occurs under your property." DEP also says that "You will be contacted by a DEP Surface Subsidence Agent before longwall mining occurs" to go through your rights.
What is a pre-mining survey and why would I want one?
It is the evidence that establishes what your property was like beforehand, and DEP frames it as a right. "You have the right to a pre-mining survey to record the existing condition of your home and water supply to help identify damage or loss of water." DEP adds that it "can also help in the design of measures that will help prevent damage to your property like bracing, trenching around the building, installing flexible connections to utilities and providing replacement water ahead of any need."
Is there a deadline for making a claim?
Yes, and missing it is costly. You have "the right to file a formal claim with DEP up to two years after the date the damage occurred", and DEP warns in terms. "If you do not file a damage claim with DEP within two years, you may forfeit your rights to repair or compensation." DEP states the trigger as "the date the damage occurred". We have not read the statutory claim-timing provisions, so we do not gloss that further — which is itself a reason to raise a problem early rather than reason about when the clock started.
Which municipalities does DEP list as having active longwall mines?
In Washington County, DEP's table names West Finley Township, East Finley Township and Morris Township against the Consol Bailey and Enlow Fork mines; South Strabane, North Strabane, Somerset, Amwell, North Bethlehem, West Bethlehem, West Pike Run and Fallowfield Townships along with Cokeburg, Beallsville, Ellsworth and Bentleyville Boroughs against Consol Mine 84; Nottingham, North Strabane, Somerset, Fallowfield and Carroll Townships with New Eagle Borough and the City of Monongahela against the Maple Creek Mine; and Carroll Township against UMCO Energy's High Quality Mine.
Is the City of Washington on that list?
No. On the list as DEP publishes it, the only city named anywhere is the City of Monongahela. The City of Washington does not appear. But South Strabane Township and North Strabane Township, which adjoin the city, both do — so a search described as "Washington, PA" can cross between municipalities that are on DEP's list and a city that is not. But the list is an indicator of where active longwall permits have existed, not the test. What engages these rights is whether the specific property is affected by underground mining — proposed, permitted or active — which is a question for DEP and the permit record about that address.
Does that mean a property in the city has no mining risk?
That does not follow, and we are not going to say it. DEP's list is about municipalities with ACTIVE longwall mines. It says nothing about abandoned workings, which are a separate matter addressed by the insurance programme, and DEP's general statement is that "Millions of structures in Pennsylvania are located over old, abandoned underground coal and clay mines." Absence from one list is not absence of risk from a different cause. The only thing that answers the question for an address is DEP's own lookup and site-specific request process.
How current is DEP's mine list?
We cannot tell you, and that is worth saying plainly. DEP's table names operators including "RAG" and "UMCO Energy, Inc." and carries no revision date on the page we read. We reproduce it as DEP publishes it and make no claim that every mine or operator listed is currently operating. Current mining status for a specific address has to come from DEP, on 800-922-1678 or through a Surface Subsidence Agent.
Does my lender require anything because of this?
Nothing on DEP's pages says so, in either direction. These pages establish what rights a surface owner has and what a coal operator owes; they state no lender requirement for coverage, a survey or a disclosure. Whether a particular lender has conditions for a property in a permitted mining area is a file-level question about that lender, and it is one worth asking at application rather than at underwriting.
What are the PHFA limits in Washington County?
Washington County carries PHFA's "(T)" Target designation, which does two things at once. The Keystone Home Loan purchase price limit is $650,900 with income limits of $132,400 for one- and two-member households and $154,500 for three or more, and in a Target county the first-time buyer requirement does not apply at all. Washington and Fayette share the highest purchase price limit printed in PHFA's Region 5; across the whole appendix only Philadelphia's $730,600 is higher. PHFA revises the appendix, so confirm the current version.